Residential Towers
08
BIM Modeling & VDC

Residential

Federated architectural and MEP modelling for a twin-tower residential development on Abu Dhabi's Corniche

/Overview
Residential Towers
SCAN 0%
ClientResidential Developer
LocationAbu Dhabi, UAE
Year2024
Area51,000 m²
LODLOD 400
DisciplinesArchitecture, MEP, Structure, Façade

Residential

A twin-tower residential development on Abu Dhabi's Corniche required federated architectural and MEP modelling from design development through to construction documentation. Our scope covered the full architectural BIM model authoring, MEP coordination, and VDC programme management across both towers.

BIM ModelingVDC
/Why They Needed Help

Where

01

Two Towers, One Deadline

Both towers had to reach construction documentation at the same time, doubling the modelling workload.

02

Repetition Needed Systematic Handling

High levels of floor plate repetition needed parametric workflows to avoid duplicating manual effort across 40+ floors.

03

No BIM Authoring Capacity In-House

The design team had the design intent but no in-house resource to author and maintain the BIM models.

04

MEP Had to Coordinate in the Model

The developer needed MEP coordination completed in the BIM model, not managed through 2D drawing review.

/Project Gallery

A look inside the project.

/Scope of Work

Where

BIM ModelingVDC
01
Architectural BIM Authoring
02
MEP Coordination
03
Federated Model Management
04
VDC Programme Management
/Key Project Challenges

What

CH.01

Scale of the Programme

Authoring and coordinating two 400-key towers simultaneously required a systematic rather than ad-hoc approach.

CH.02

Repetition Without Error Propagation

Parametric floor plate repetition had to be managed carefully to avoid propagating errors across all floors.

CH.03

MEP in Tight Ceiling Zones

Residential ceiling zones left minimal coordination space, requiring MEP routing to be resolved precisely in the model.

CH.04

Construction Documentation from Model

All construction drawings had to be extracted directly from the BIM model, putting model quality under direct commercial pressure.

/Execution Strategy

How

Build Once, Repeat Systematically

A parametric floor plate workflow was established so the standard floor could be built once and propagated correctly.

01
02

Coordinate MEP in Model

All MEP coordination was completed in the federated BIM model before any construction drawings were issued.

Run Both Towers in Parallel

Both towers were modelled simultaneously by a structured team, with shared coordination sessions and clash reviews.

03
04

Extract Drawings Directly

All construction documentation was generated directly from the BIM model, eliminating the need for a separate drawing production workflow.

/Solution Delivered

What

Layer 01

Federated Architectural Model

LOD 400 architectural BIM model for both towers, coordinated against structural and MEP disciplines.

Layer 02

Coordinated MEP Model

Full MEP coordination completed in the federated model across all floor zones.

Layer 03

Construction Drawing Package

Complete construction documentation extracted directly from the BIM model.

Layer 04

VDC Programme Record

Programme management record covering model submissions, coordination sessions, and clash resolution history.

/Business Impact

What

0Twin towers modelled at LOD 400
0Towers coordinated in one federated model
0Construction documentation from BIM model
0Drawing production time saved vs traditional workflow
/Tools Used

What

R
Autodesk RevitBIM Authoring
N
NavisworksModel Coordination
B
BIM 360Cloud Collaboration
D
DynamoWorkflow Tool
/Client Testimonial

“Neutec handled the scale of two towers simultaneously without losing coordination quality on either. The documentation came out of the model clean.”

Project Manager

Residential Developer

/FAQ

Questions

/Certifications

Certifications

Our certified management systems support consistent quality, information management and controlled project delivery across the work we do.

Information Management certification

Information Management

Quality Management certification

Quality Management

Information Security certification

Information Security

Environmental certification

Environmental

PLAN · COORDINATE · DELIVER · OPTIMISE ·PLAN · COORDINATE · DELIVER · OPTIMISE ·PLAN · COORDINATE · DELIVER · OPTIMISE ·PLAN · COORDINATE · DELIVER · OPTIMISE ·PLAN · COORDINATE · DELIVER · OPTIMISE ·PLAN · COORDINATE · DELIVER · OPTIMISE ·

Let's

Whether you need BIM coordination, digital engineering or end-to-end project delivery support, our team is ready to help you deliver projects with greater certainty, fewer surprises and stronger collaboration.

Start Your Project